Deepwater Direct Offloading Systems, Phase 1 (HiLoad DP) (10121-4407-01)

$
0
0

Remora Technology, Inc. - Principal Investigator: Kim Diederichsen

Objective: The primary objective is to provide sufficient knowledge to proceed immediately with the final engineering and contracting process to make the HiLoad DP concept available to GOM operations. It is the intent of this project to define an alternative deepwater offloading solution that enables access to utilization of conventional standard tankers that are neither purpose build or fitted with any special means or equipment.
 
Period of Performance: August 26, 2012 to August 15, 2013
 